Cable interface
Confirm conductor bundle diameter, aperture, connector and cable-access constraints.
Auxiliary Absorbing Clamp for emc clamps applications across 30 MHz–1000 MHz, designed for integration into laboratory and field EMC measurement chains.

Key published specifications for initial equipment selection. Final configuration, accessories and calibration scope are confirmed in the datasheet and quotation.
These are the points our application team will confirm before finalizing the model, accessories and calibration scope.
Confirm conductor bundle diameter, aperture, connector and cable-access constraints.
Match monitoring or injection range to the amplifier, load and calibration fixture.
Plan the calibration fixture, RF cable, termination and monitoring equipment.